REPLACEMENT OF SIGNALING EQUIPMENT IN PODGORICA STATION

PODGORICA, MONTENEGRO



The signalling system has reached the end of the economic life. Certain components of the system (e.g. relays) are deteriorated and are source of disturbance. Since they are no longer produced in standard production programs, their replacement and maintenance become very difficult, therefore the replacement of the signaling system is became mandatory.


Project description

The main activities of Railway Signaling Design Component was Detailed Design for equipment and works which was performed on signaling devices in Podgorica station. The design is complained with all national regulations in effect in Montenegro and international regulations. Tender Documents for construction was prepared based on the Detailed Design. They include all elements defined in the Terms of Reference for this type of equipment. The Detailed Design involves the complete replacement of the existing relay security system (Siemens SpDr 64-JŽ) electronic security system, complete replacement of all elements of the signal system (signals, axle counters, railway-level crossings), existing cable network, adapting the existing devices of interstation dependence to Bioce, Spruž, Golubovci and Tuzi stations.


 ABOUT PODGORICA RAILWAY STATION

Podgorica railway station is located on the Belgrade-Bar-Bijelo Polje and is the main node station for receipt and dispatch of trains from the direction Bioča, Spruž, Golubovci and Tuzi. Existing security station system for signaling and interlocking devices are Siemens El SpDrS-64-JŽ relay type for full centralization which are manufactured and assembled in 1978.



LAST UPDATE: 11.10.2017


 FACTS ABOUT THE PROJECT

Project purpose
Improvement of the Railway Traffic Signalization

Beneficiary
JSC Railway Infrastructure of Montenegro

Client
European Investment Bank (IPF4)

Project period
2014-2015


 SERVICES

- Technical report with description of works
- Technical conditions for equipment and work
- Tender Dossier
- Detailed Design
- Study on the protection at work
- Preparation of priced bill of quantities
- Participation in development of procurement strategy