ASPHALTING THE MAIN ROAD NETWORK

SINJAJEVINA, MONTENEGRO



Feasibility study and design for asphalting the main road network in order to support sustainable management and socio-economic development of Sinjajevina through inter-municipal cooperation of the municipalities of Mojkovac, Kolašin, Žabljak, Šavnik and Danilovgrad establishing and operationalizing the Regional Park and improving key visitor infrastructure.


Project description

The feasibility study addressed the feasibility of the project under an economic, social and technical point of view. Detailed Design of road is based on the ToR and all necessary drawings and layouts, BoQ with estimated costs for designed works, are developed with special attention to secure use of the road and to environmental protection. Road network on Sinjajevina, in the total length of 60 km, includes:
- in the municipality Mojkovac territory - 39,50 km
- in the municipality Savnik territory - cca 12,80 km
- In the municipality Zabljak territory- cca 6,70 km


 ABOUT SINJAJEVINA

Sinjajevina represents a large high plateau shared administratively by four Municipalities: Mojkovac, Žabljak, Šavnik and Kolšin. A key problem for the sustainable socio economic development of Sinjajevina and for preservation of the grassland habitats is the poor accessibility of the area that is leading to the decline of pastoralism.



LAST UPDATE: 13.10.2017


 FACTS ABOUT THE PROJECT

Project purpose
Road network and county economy improvement

Beneficiary
Municipality of Mojkovac

Client
Municipality of Mojkovac (co-funded though IPA fund and national fund)

Project period
2014-2016


 SERVICES

- Feasibility study
- Geodetic cadastral survey
- Study of the field testing
- Geotechnical layouts
- Hydro and hydrometeorology layouts
- Conceptual Design solution
- Detailed Design


 CONTACT

Ivana Stevanović
Head of Department
Roads, Railways and Airports
Tel + 381 11 38 35 040
ivas@cestra.rs