TOPOLA 1-BUCIN GROB

STATE ROAD IIA 152, SERBIA



Main Design for Urgent Maintenance and Remedy of Damages on the State Road IIA 152 on the section Topola 1-Bućin Grob.


Project description

The design of urgent road maintenance and road damage remedy is a part of the support programme from international finance institutions directed to the government of the Republic of Serbia to be implemented into the National program for rehabilitation of road network.

The aim was to prepare design for urgent road maintenance which will secure damage remedy caused by floods, landslides and erosion influenced by water, remove the causes of damages, increase the usability and durability of the road, taking into account the demands made by the local community and secure the maximum compatibility, possibly with the environmental protection demands, as well as limitations which stem from the type of the permitted construction and traffic interventions.


 ABOUT SECTION TOPOLA 1-BUĆIN GROB

- 27,28 km of road
- 6 sub-sections
- 9 existing bridges
- 14 torrential stream locations
- 12 landslides, total length 520 m



LAST UPDATE: 19.10.2017


 FACTS ABOUT THE PROJECT

Project purpose
Road network improvement

Beneficiary
PE Roads of Serbia

Client
JV Srbijaautoput and Planum

Project period
2015-2017


 SERVICES

- Design Basis
- Main Design for urgent maintenance
- Environmental Management Plan
- Technical Specifications