RAILWAY SECTION DOBOJ-TUZLA-BRČKO

BOSNIA AND HERZEGOVINA



Preliminary studies and designs for overhaul and modernisation of the specific railway on the priority sections of the SEETO railway comprehensive network.


Project description

Preliminary studies and designs are prepared for 120 km railway section. Project covers track, electric traction power facilities, OCL, telecommunication systems and interlocking and signaling devices for overhaul and modernization of railway sections Kostajnica (Doboj) - Tuzla and State border with the Republic of Croatia - Brčko - Bosanska Poljana. Design speed is 80 to 120km/h
The entire projects is developed fully in accordance to the laws applicable in Bosnia and Herzegovina, applicable standards and regulations) in the country, design requirements, special requests of the Employer, and international standards and recommendations (e.g., but not necessarily limited to for Conventional Rail Systems (TSIs CR)).


 ABOUT DOBOJ-TUZLA-BRČKO RAILWAY LINE

- 103 intersection/level crossings
- 51 bridge
- 19 stations
- 4 tunnels
- Current max speed in tunnels is 12 km/h



LAST UPDATE: 12.10.2017


 FACTS ABOUT THE PROJECT

Project purpose
Improvement of the railway infrastructure

Beneficiary
Railway authorities in Bosnia and Herzegovina

Client
Delegation of the European Union to Bosnia and Herzegovina

Project period
2015-2016


 SERVICES

- Technical study, including determination and elaboration of potential alternatives of overhaul and modernization
- Traffic study
- Multi-criteria analysis
- Preliminary environment impact assessment
- Pre-feasibility Study
- Revision of the Preliminary Solution / Conceptual Designs
- Railway Track Study
- Tunnels, bridges, viaducts, overpasses, underpasses
- Railway Signaling Facilities
- Electric Traction Facilities, Catenary wire
- Telecommunication Systems
- Tender dossier for provision of preliminary and main design