BLOCK 53 – PARKING SERVICE PC

BELGRADE, SERBIA



Detailed regulation plan of Block 53 in New Belgrade was the basis for the development of technical documentation, development and use of land in Block 53.


Project description

Solution of water supply network was done in accordance with the terms of Public Utility Company BVK and regulatory plan. According to the relative position of the matched installation rout of the pipeline is set mainly in the green area out of parking services.

New designed supply network is connected to the existing hydrant network in nodes 1 and 2 to the existing internal network from a ring. Length of projected network is 462 m and the drop tube is projected 0.2% from node 1 to node 2. Bearing in mind the high pressures in the existing network, there was no need to establish a new connection to the road.

Bill of quantities of works covers all the necessary work for performing the plumbing. It is anticipated that the water supply system will be carried out after removing the humus for the needs of new roads, before making a single road, i.e. after removing the old pavement, and before the construction of existing roads.


 ABOUT BLOCK 53 – PARKING SERVICE

Water supply network is provided through PEHD pipe diameter ø110 mm for an operating pressure of 10 bar. The width of the trench is 0.8 m. At this stage is also planned and a new administration building. Water supply of this building, as well as sanitary and garden hydrant network is not the subject of this project.



LAST UPDATE: 19.10.2017


 FACTS ABOUT THE PROJECT

Project purpose
Providing water supply system

Beneficiary
City of Belgrade

Client
Empex / Parking Service

Project period
2015-2015


 SERVICES

- Development of the technical documentation
- Development and land use in Block 53
- The solution of the water supply network
- Geotechnical study