CONCEPTUAL DESIGN OF OLD SAVA BRIDGE

SERBIA



Preparation of the conceptual solution for 5 alternatives considering special requirements from the Institute for protection of the cultural monument.


Project description

The aim of this project was the development of conceptual solution for reconstruction of old Sava bridge, in order to obtain locational conditions in accordance with the Amendments to the Law on Planning and Construction.

For all 5 developed alternatives the following documentation was prepared:

Volume 0 Main Volume
Volume 1 Structural Design
Volume 2 Road Design
Volume 3 Hydro-technical installations Design
Volume 4 Design of Electrical Installations


 ABOUT THE BRIDGE

Old tram bridge is one of the main bridges that connects New Belgrade with downtown. In current situation bridge has one lane per direction that is shared between trams and vehicles. The aim of the reconstruction was to increase the capacity of the bridge by providing two vehicular lanes per direction and separate lanes for the trams.



LAST UPDATE: 13.11.2017


 FACTS ABOUT THE PROJECT

Project purpose
Construction of new bridge

Beneficiary
Belgrade Land Development Public Agency / City of Belgrade

Client
Belgrade Land Development Public Agency

Project period
2015-2016


 SERVICES

  • Preparation of the Bridge design
  • Preparation of the Road design
  • Preparation of the Drainage design
  • Preparation of Lighting design
  • Traffic signalization
  • Traffic management plan
  • Evaluation of proposed alternatives