PFS WITH GENERAL (CONCEPT) DESIGN - RAILWAY LINE STALAC – KRALJEVO – RUDNICA

SERBIA



Prefeasibility Study (PFS) with General (Concept) Design for Reconstruction and Modernization of Railway Line Stalac - Kraljevo – Rudnica.


Project description

The overall objective of the project is to safeguard the functionality of the railway line, increase operational speed and reduce travel times, improve traffic safety and reliability of the railway infrastructure, and thus support the growth of passenger and freight traffic on the line.

The objective of the services is to provide qualified technical assistance for the preparation of the Prefeasibility Study and General (Concept) Design for the railway line.

The Prefeasibility Study should identify an appropriate range of alternative solutions and evaluate and compare them from a functional, technical, economical, financial, spatial, environmental, and social point of view as basis for a sound selection and justification of the optimal option. The Prefeasibility Study and General (Concept) Design should provide accurate data that also meet the detail requirements for use in planning documents and subsequent preparatory studies (Feasibility Study and Preliminary Design).


 ABOUT RAILWAY LINE STALAC – KRALJEVO - RUDNICA

- Section Stalac – Kraljevo
SEETO Rail Route 11: length 72 Km, current
operational speed 40Km/h
- Section Kraljevo – Rudnica
SEETO Rail Route 10: length 77 Km, current
operational speed 60Km/h



LAST UPDATE: 14.11.2017.


 FACTS ABOUT THE PROJECT

Project purpose
Definition of the best improvement alternatives for the two sections of the railway line

Beneficiary
Ministry of Construction, Transport and Infrastructure and JSC ‘’Serbian Railways Infrastructure’’ Belgrade

Client
EIB (IPF5)

Project period
2017-ongoing


 SERVICES

  • Provision of methodology for organisation of the activities
  • Review of previous studies, maintenance records and background information
  • Analysis of the existing situation, namely physical condition of the infrastructure; organisation and performance of the services for both passengers and freights; current and historic traffic analyses
  • Assessment of the proposed alternatives, description of options, options selection, presentation of the overall design standards and costs for each option, provision of the framework for options’ assessment
  • Development of the appropriate transport model in VISUM
  • Geological and geotechnical investigations; topographical (geodetic surveys)
  • Preliminary environmental impact assessment; Preliminary cost-benefit analysis
  • Development of a full General (Concept) Design
  • Preparation of the Prefeasibility Study Report